Which is better, balcony integrated ceiling or gypsum board ceiling? Ceiling is a kind of decoration method often used in family decoration. There are many choices of ceiling materials, and the quality and practicability of the ceiling need our attention. Let's take a look at the balcony integrated ceiling and gypsum board ceiling.
Which is better to install integrated ceiling or gypsum board ceiling on balcony? 1 Gypsum board ceiling is adopted for the balcony ceiling. If it is for short-term economic consideration, we can try it, because gypsum board is widely used in multi-scene fields, with long circulation time, low production cost and low technical requirements, but it is not satisfactory in environmental protection, service life, aesthetics and physical stability.
What is an integrated balcony?
Integrated balcony is an integrated balcony decoration solution aiming at the disadvantages of traditional balcony, such as complicated procedures and chaotic decoration. The purpose is to create a balcony system with overall style, intelligent household appliances (dryers), multifunctional scenes and other highlights, which consists of top surface, wall surface, guardrail surface tube, column, lower cross bar, glass column, intelligent household appliances and so on.
On the whole, we can create scene spaces with different styles and functions according to customers' needs, from single drying to functional scenes such as storage area, leisure area and office area.
Development prospect of integrated balcony
The traditional gypsum board balcony ceiling, after a long period of wind and sun exposure, will lead to peeling, moisture and mildew, which is neither beautiful nor healthy, and it is difficult to maintain in the later period.
Integrated balcony system can solve these shortcomings. Compared with the decoration cost, if the area of a single balcony is 8 square meters, the labor cost can be saved by about 5,000 yuan (due to different decoration concepts, the cost saved is also different, and this data is for reference only).
Compared with the material, the ceiling and top surface of gypsum board are scraped white. This material has too many processing procedures, high labor cost, and the top surface of the blank needs to be processed. Single color, mostly white.
superiority
1, strong moisture-proof performance.
Aluminum alloy, aluminum honeycomb integrated balcony, moisture-proof, anti-corrosion, antibacterial ability; Strong physical stability, strong durability under long-term sun exposure and long service life.
2. Personalized and customized styles and diverse shapes
From the integrated ceiling and integrated wall, you can choose a variety of materials to install, and flexibly customize the exclusive balcony decoration plan.
3. Multifunctional scenes
It is not only limited to drying, but also can change the regional space attributes, such as storage, leisure and entertainment, study and office, exercise and fitness, and experience different comfort.
Integrated balcony hung ceiling
On the whole, it is convenient and efficient for consumers to combine several original product modules into one, which integrates drying, lighting, leisure and storage.
From the safety point of view: avoid "falling off" and other hazards, gypsum board ceiling will inevitably fall off for a long time.
From the point of view of environmental protection: the material adopts a variety of environmental protection processes, with firm and clean surface, good physical stability, aging resistance and convenient disassembly, cleaning and upgrading.
From the point of view of personality: you can install the special decoration scheme customized by customers, assemble and combine, choose diversification and taste diversification.
Which is better, balcony integrated ceiling or gypsum board ceiling? 2 integrated ceiling
Integrated ceiling is a modular aluminum gusset ceiling, made of metal materials, which can be divided into aluminum alloy gusset plate, aluminum-magnesium alloy gusset plate, aluminum-magnesium alloy gusset plate and so on. It has good elasticity and toughness, is not easy to deform, and is more suitable for daily kitchen and bathroom use. After the upgrade, it can be better used with lighting, exhaust and sound. Integrated ceiling is the mainstream of kitchen and bathroom ceiling, which integrates lamps, exhaust fans, yuba and other products in one ceiling, and the materials are mostly aluminum gusset plates.
Advantages: the appearance is flat, the surface coating is smooth, and it is also widely used in public places such as offices. Disadvantages: the gap at the joint is very obvious.
Gypsum board hung ceiling
Gypsum board is a new type of ceiling decoration material widely used at present. It has good decorative effect and sound absorption performance, and its price is lower than other roof decoration materials.
Advantages: waterproof gypsum board+waterproof latex paint+cement-based waterproof putty is used, which is waterproof and crack-resistant. The joint between the ceiling and the wall is further sealed with neutral mildew-proof silica gel to further isolate moisture and make the gap more beautiful. Disadvantages: it is inconvenient to disassemble.
Style difference between integrated ceiling and gypsum ceiling;
Gypsum ceiling: basically white, single shape. The monotonous white tone makes people miss the different experiences of life.
Integrated ceiling: adopting various technologies and rich colors; At the same time, the changeable structure can present a strong and rich visual effect, bringing together European, Chinese, modern and other different style elements, perfectly covering the whole house space such as kitchen and bathroom, living room, dining room, bedroom and study; And complex, multi-storey complex and other changeable structures, creating a changeable spatial effect. Personalized decoration to meet the decoration needs of different families.
Environmental differences between integrated ceiling and gypsum ceiling;
Gypsum ceiling: it is made of plaster of Paris as the main raw material and mixed with additives and fibers; Paint is needed to complete the decoration effect when decorating. Additives and coatings often contain toxic volatile substances such as formaldehyde, which have pungent taste and long volatilization time. It not only affects the living experience, but also affects health over time.
Time difference between integrated ceiling and gypsum ceiling;
In the process of gypsum ceiling construction, it is necessary to go through the processes of screwing the top screw, installing the keel, hanging the board, scraping putty, primary painting, secondary painting, completion and so on, and the installation is cumbersome; The second coating needs to be dried by the previous coating, which prolongs the construction period.
Installation process of integrated ceiling: screwing top-installing keel and fittings-installing ceiling module-completed, with fewer links and simpler operation. The whole house ceiling decoration can be easily completed in 7 days; Coupled with the health and environmental protection of the ceiling, it can really be installed.
Which is better to install integrated ceiling or gypsum board ceiling on balcony? 3 how to install the integrated ceiling?
First, understand the installation environment.
Before installing the integrated ceiling, the embedded work should be done well in the building structure, bolts should be embedded in the precast slab structure and concrete structure, and the installation tools, such as screwdriver, wiring board and electric pen, should be cleaned up before installation.
Second, the debugging inspection
Before installing the integrated ceiling, connect the LED lamp and the temperature display module, then insert the debugging plug of the integrated chandelier into the socket for debugging, and check whether all functions are normal. Debugging time should not be too long. Please refer to the debugging instruction manual. After debugging, remove the debugging patch cord.
Third, check the accessories.
Integrated ceilings are generally equipped with non-return valves, ventilation pipes, switches, installation buckles, manuals and other accessories. Check whether all accessories are complete before installation, any of which will affect the installation.
Four, keel installation
Clamp the main keel on the major lifting pieces, select and intercept the required main keel according to the space size, insert the triangular lifting pieces into the triangular keel, and fix the triangular lifting pieces on the main keel in turn. After the main keel is connected with the triangular keel, adjust the distance between the triangular keels to 30cm, insert the connector into the fixed triangular keel, then cut the required length and insert it into the other end of the connector.
Verb (short for verb) Install gusset.
After the keel is set up and the mouth of the range hood is reserved, the pinch plate can be installed, white gloves can be put on, and the film on the four sides of the pinch plate can be lifted, but it is not necessary to completely tear it off.
Six, electrical installation
According to the design drawings, confirm the exact installation position of the main engine, and then start to install electrical equipment. Insert one side of the clamp spring into the round hole on the rectangular clamp spring, align it with the round hole on the electrical cabinet, put the cabinet with the clamp spring on the keel, and connect the power cord according to the wiring label according to the corresponding function.
Seven, check the effect
Check whether the pinch plate is installed smoothly, whether the electrical appliance can be used normally, whether the visual level of angle wire installation is good, whether there is a gap or obvious distortion at the 90-degree angle, whether the distance between screws meets the installation standard, and then pull the screws several times with proper tension by hand to confirm whether they are loose and test whether the functions of the electrical appliance are functioning normally.
1. What are the basic skills of ballet?
The basic skills of ballet can be divided into three categories: ground quality training exercises, upper exercises an