Who will organize the fire inspection and acceptance?
Fire acceptance is generally carried out by the Ministry of Housing and Urban-Rural Development, that is, unified acceptance is carried out by the Ministry of Housing and Urban-Rural Development. There are clear requirements in the Notice of the Emergency Management Department of the Ministry of Housing and Urban-Rural Development on Doing a Good Job in the Handover and Acceptance of Fire Protection Design of Construction Projects.

1. fire engineering acceptance organization form

The acceptance of fire protection project is organized by the construction unit, presided over by the supervision unit, commanded by the fire department, and participated by the construction unit (civil engineering, decoration, piping, electrical, ventilation and air conditioning, fire protection professional debugging team, etc.). ) and design unit. At the same time, it should also organize professional and technical personnel from fire supervision and inspection, fire product quality supervision, fire training and fire supervision and audit of construction projects to participate.

2. The fire engineering acceptance procedures:

(1) acceptance

The construction unit shall apply to the public security fire control institution.

(2) On-site inspection

Mainly check whether the engineering entity meets the approved fire protection design, including:

(1) Type of building or nature of production device;

(2) Equipped with various fire-fighting facilities;

③ General layout of the building;

(four) the internal layout of the building;

⑤ Safe evacuation passage;

⑥ Layout of fire truck passage.

(3) Site acceptance

Public security fire control institutions shall arrange for the use of tools, equipment and instruments that meet the requirements, conduct on-site inspection of installed fire control projects in accordance with the national technical standards for fire control of engineering construction, and record the inspection results, which shall be signed by the personnel of the construction unit who participated in the on-site acceptance.

(4) Conclusion evaluation

After the on-site inspection and on-site acceptance, the records formed in the process of inspection and acceptance shall be comprehensively evaluated according to the relevant evaluation rules of fire control acceptance, and the acceptance conclusion shall be drawn, and the fire control acceptance opinions of building projects shall be formed.

(5) Project handover

By the construction unit, supervision unit and construction unit handed over to the use of units or production units.

There are two aspects of transfer: the transfer of engineering data (technical and economic documents formed in the process of design, construction and acceptance) and the transfer of engineering entities.

Transfer of guardianship and maintenance responsibilities.

Relevant provisions and contents of fire control acceptance:

1. The handover scope covers fire rescue departments at all levels, and undertakes the design and acceptance work in accordance with the Fire Protection Law of People's Republic of China (PRC).

2. There is a date requirement for the review and acceptance of fire protection design of building projects, and relevant departments shall complete the handover according to regulations.

3. If the undertaking institution for the audit and acceptance of engineering fire protection design has been defined, the undertaking institution shall conduct special acceptance and audit and acceptance.

4, around the urban and rural construction and housing departments in a timely manner to confirm the area and drawings of fire rescue agencies.

General rules for fire control acceptance:

1, in order to comprehensively strengthen the fire supervision and daily management of construction projects and strictly implement relevant responsibilities, it must be strictly implemented in accordance with regulations.

2 these provisions are used for the daily fire supervision and management of reconstruction, expansion and new construction projects.

Legal basis:

Regulations on fire control supervision and management of construction projects

Thirteenth in any of the following circumstances, the construction unit shall apply to the fire department of the public security organ for fire control design review, and after the completion of the construction project, apply to the fire department of the public security organ for fire control acceptance:

(a) stadiums, auditoriums, public exhibition halls and museum exhibition halls with a total construction area of more than 20,000 square meters;

(2) Civil airport terminals, passenger station waiting rooms and passenger station waiting rooms with a total construction area of 15000 square meters or more;

(3) Hotels, restaurants, shopping malls and markets with a total construction area of over 10,000 square meters;

(4) theaters, public library reading rooms, business indoor fitness and leisure places, hospital outpatient buildings, teaching buildings, university libraries and canteens, production and processing workshops of labor-intensive enterprises, temples and churches with a total construction area of more than 2,500 square meters;

(5) Children's rooms in nurseries and kindergartens with a total construction area of 1000 square meters or more, indoor places for children's activities such as children's playrooms, ward buildings in nursing homes, welfare homes, hospitals and sanatoriums, teaching buildings, libraries and canteens in primary and secondary schools, dormitories in schools and dormitories for workers in labor-intensive enterprises;

(6) Song and dance halls, video halls, projection halls, karaoke halls, nightclubs, amusement halls, saunas, Internet cafes, bars, restaurants, teahouses and cafes with entertainment functions with a total construction area of over 500 square meters.